When should you plan a racking project? Why plan your project ahead?
First of all, planning your shelving, pallet rack or “racking” project should help you save money. A common mistake when buying racking for your warehouse is starting too late. As a result, you have to buy what is left on the market instead of what best suits your need. By buying at the last minute, you risk forgetting items and having to reorder afterwards. A second order can mean additional shipping costs, extra lead time, unit prices that are too high and that you could have avoided, etc.
Your needs and the racking project plan
Your planning should start by determining your need. The number of pallets to store, their weight and dimensions are some of the things that must be known before preparing a plan. You may need help as early as this stage. Don't hesitate to contact a professional at any time to assist you. Then, based on your warehouse dimensions, you can draw up a plan of your project. You don't need to be an architect to draw a plan; what matters is knowing the measurements. The AREIC INC staff can help you with what needs to be in your plan. From your first plan, it will be possible to determine whether an engineer is needed at this stage or not. At this stage you can also plan your preferences in terms of rack protection and other accessories that can save you money in the medium and long term.
Also note that, in theory, you should have an engineer-sealed plan for any type of warehouse. This standard applies to warehouses of all sizes.
The order
Now that you know what you need, you can look at what is available on the market. For new racking, beyond a certain quantity, it can be more economical to have your racking manufactured. You should then allow an average lead time of 8 weeks before delivery. This lead time can of course change depending on the time of year. That is why calling on an AREIC advisor can already help you. Very often, by having the time to order ahead like this, you can save 10% to 25% compared with the price listed by suppliers who have the material in stock immediately. This option will also let you order the load capacity signs that will be needed to meet CNESST requirements.
If you were leaning more towards used, that is also possible. However, you will still have to meet the same capacity signage standards. An engineer may be needed to confirm the capacities of your racking according to dimensions and heights. Used inventory can change very quickly, so being able to reserve your material in advance will once again let you save.
Installing a racking project
Do you expect to need installation? That is perfectly normal, and you will be able to certify your racking more easily since it will be professionally installed. However, once again, you need to plan ahead! Good crews are booked well in advance on projects. So, as soon as your order is placed, book your installer for an approximate date following the scheduled delivery.
In short, planning a racking project will save you money, time and above all a lot of stress. Stress your company truly doesn't need. Good luck with your project!